ALTAWFIQ EXPERTISE

Façade Cladding

Considered façade finishes, panel layouts and colours that give a building a distinct identity.

CONSIDERED FOR YOUR PROJECT

From the brief to the finished detail.

A coherent façade starts with understanding the building, selecting the cladding material and planning panel divisions carefully. Our cladding work follows a defined scope: review the intended appearance, survey the surfaces and take measurements, then propose panel layouts, colours and finishes suited to the use and architectural identity. Panel type, thickness, composition and fixing details are determined against project requirements and applicable rules, with relevant safety requirements reviewed before material approval. Once agreed, the elements are prepared and installed with attention to joints, corners, terminations and connections with glass or other façade materials. Cleaning, access and maintenance needs are also discussed so that design and installation decisions reflect the actual building and its longer-term use.

Panel layouts and colours that support the building identity
Materials selected against project requirements
Careful corners, terminations and joints
Coordination with glazing and adjoining elements

A CLEAR SCOPE

What we define before execution.

Each project’s scope and specification are confirmed in the quotation and agreement.

01

Façade survey, measurements and panel layout study

02

Panels, finishes and fixings defined in the quotation

03

Preparation and fabrication of the agreed cladding elements

04

Installation and review of joints, corners and terminations

DESIGN INSPIRATION

Four views. More possibilities.

Illustrative service concepts, not documented company projects.

A CONSIDERED PROCESS

From the first idea to the final detail.

01

Understand your vision

We discuss your needs, survey the site and review dimensions and requirements.

02

Define the details

Design, materials, scope, cost and dates are agreed before work begins.

03

Fabricate and execute

Fabrication, preparation and execution follow the approved specification.

04

Install and hand over

The finished work and its details are reviewed for the agreed handover.

CONNECTED EXPERTISE

More possibilities for your project.

Let’s talk